Data Center Case Study - Victoria Theatre Association


RESOURCES

Victoria Theatre Association

Background

The Victoria Theatre is a historic 19th-century structure that is host to numerous shows and events and is part of an arts complex that also includes the Benjamin and Marian Schuster Performing Arts Center.

The Situation

The Victoria Theatre Association needed improved power protection for the critical switches and telecom equipment that serve the theatre and an adjoining performing arts complex. The main server room and two intermediate distribution frames are located in the Victoria Theatre, which is connected to the performing arts complex by an underground fiber optic backbone.

Results

  • Successful upgrade of power protection system for distributed network.
  • Increased ability to ride through power outages and isolate sensitive electronics from power disturbances caused by theatre equipment.
  • Improved ability to configure power protection to application requirements.
"I was pleased with Liebert in every aspect. They know what customer service is about and they have a reliable product."
- Chris Zanowick, IT manager, Victoria Theater Association
Case Summary
Location: Dayton, Ohio
Products and Services: Liebert GXT uninterruptible power systems
Critical Needs: Minimize the impact of power outages and disturbances created by internal equipment on critical electronics.
 

Read more about the Victoria Theatre Association case study.​