Liebert Case Studies by Solution - Data Center Cooling

 
LIEBERT

Liebert Case Studies by Solution - Data Center Cooling

Liebert solutions help this technology company achieve its business continuity objectives for advancing data center infrastructure design.
Discover the cooling design strategies that allow BLACKIRON Data to use free-cooling more than 75% of the year without chiller plants or water, and helped to earn Uptime Institute Tier III certification and environmental LEED Silver certification for their Toronto_DC3 data center.
Gridway Computing Corporation deployed the SmartAisle infrastructure including integrated row-based power and cooling to save space, cut costs and maintain a flexible plan for expansion. GridWay now supports its clientele  with a smaller, more energy-efficient data center footprint.
See how Pennsylvania Training and Technical Assistance Network (PaTTAN) deployed a brand new data center infrastructure, including racks, power, cooling, monitoring and fire suppression in a single weekend.

Sarasota County’s new facility needed to deliver scalable capacity and efficient operation throughout the lifecycle of their virtualized data center, while assuring continuous operation of government functions. A SmartDesign infrastructure now optimizes efficiency, capacity and availability.

The Tampa Bay Rays selected the SmartRow solution from Emerson Network Power, as it increases data center capacity to support high-performance computing needs while reducing operational costs and delivering maximum availability.