Liebert Case Studies by Solution - Data Center Cooling


Liebert Case Studies by Solution - Data Center Cooling

Discover the cooling design strategies that allow BLACKIRON Data to use free-cooling more than 75% of the year without chiller plants or water, and helped to earn Uptime Institute Tier III certification and environmental LEED Silver certification for their Toronto_DC3 data center.
Gridway Computing Corporation deployed the SmartAisle infrastructure including integrated row-based power and cooling to save space, cut costs and maintain a flexible plan for expansion. GridWay now supports its clientele  with a smaller, more energy-efficient data center footprint.
See how Pennsylvania Training and Technical Assistance Network (PaTTAN) deployed a brand new data center infrastructure, including racks, power, cooling, monitoring and fire suppression in a single weekend.

Sarasota County’s new facility needed to deliver scalable capacity and efficient operation throughout the lifecycle of their virtualized data center, while assuring continuous operation of government functions. A SmartDesign infrastructure now optimizes efficiency, capacity and availability.

The Tampa Bay Rays selected the SmartRow solution from Emerson Network Power, as it increases data center capacity to support high-performance computing needs while reducing operational costs and delivering maximum availability.