Liebert Case Studies by Issue Solved - Energy Efficiency and Sustainability

 
LIEBERT
Emerson Network Power > CHINA > Products > By Brands > Liebert > Case Studies > Energy Efficiency and Sustainability
Liebert Case Studies by Issue Solved - Energy Efficiency/Sustainability
A leading communications and media company in the Northeast U.S. installed a SmartMod infrastructure solution at a remote location, providing additional data and Internet capacity without taking up more facility space.  The containerized data center has reduced costs by minimizing installation time, and eliminating potentially costly room upgrades in the main building.
Discover the cooling design strategies that allow BLACKIRON Data to use free-cooling more than 75% of the year without chiller plants or water, and helped to earn Uptime Institute Tier III certification and environmental LEED Silver certification for their Toronto_DC3 data center.
Gridway Computing Corporation deployed the SmartAisle infrastructure including integrated row-based power and cooling to save space, cut costs and maintain a flexible plan for expansion. GridWay now supports its clientele  with a smaller, more energy-efficient data center footprint.
Liebert Case Studies by Solutions - Microsoft Technology Center: Philadelphia
See how Pennsylvania Training and Technical Assistance Network (PaTTAN) deployed a brand new data center infrastructure, including racks, power, cooling, monitoring and fire suppression in a single weekend.