Liebert Case Study - Big City Radio


LIEBERT

Big City Radio

Background
When Big City Radio chose to move its Ventura, CA, station to a new location, it chose a communications site that was already home to two other radio stations. The stations would share a concrete block building that was about 30' × 30'. With all three stations sharing the building, data center cooling is a major issue. Air is forced into the building through a filtered blower on the roof. To allow the forced air to escape, every third concrete
block is turned on its side on the top of the building on three sides. Additional cooling is provided by two consumer-style window air conditioners mounted in the walls.

Case Summary
Location: Los Angeles, California

Products/Services

  • Liebert Little Glass House
  • Liebert Foundation Series

Critical Need
In today’s climate of consolidation, data center efficiency is fast becoming a standard operating procedure. Engineers are being asked to put more equipment into smaller spaces. Three things must be considered when reliability is concerned: cooling, cleanliness and clean, uninterruptible power.

Results

  • Adjustable rack rails
  • Threaded or square rack rail holes
  • Climate-controlled rack
  • Integral UPS system
  • Optional monitoring capability

 To read more, download the Big City Radio case study.