Testing


CHLORIDE INDUSTRIAL POWER

Testing

Prior to the witness test and inspection, our engineers test performances, operation modes and specific functions of each system.

Our test bay is fully equipped to ensure foolproof testing:

  • 1 MVA upstream transformer
  • 16 test bays, from 100 to 1000 A
  • 1.5 MW load bank for full load tests

All testing equipments and infrastructures are regurarly checked and upgraded in order to ensure the highest degree of safety while our operators and engineers test the systems.

  • Equipment testing is made according international approved standards
  • Inspection procedure available for the customer
  • Dedicated inspection report is delivered with full technical testing details as well as customer’s comments 
Benefits